Send Message
Dawnergy Technologies(Shanghai) Co., Ltd.
Email Peter.bi@dawnergy.com TEL: 86-21-67877780
Home
Home
>
news
>
Company news about Deliverd FDC and Patch Panel With Totally 1893 Units
Events
LEAVE A MESSAGE

Deliverd FDC and Patch Panel With Totally 1893 Units

2022-05-03

Latest company news about Deliverd FDC and Patch Panel With Totally 1893 Units

Dawnergy adjusted its transportation schemes in this complicated situation. All products to be shipped from Shanghai are transferred to Ningbo port or ports in Northern China, which ensured the customer's needs in a timely manner. They are totally 20 containers for a well-known African telecom operator will be shipped in three batches while the first batch had already been loaded on Apr. 24th.

latest company news about Deliverd FDC and Patch Panel With Totally 1893 Units  0

Figure 1 

The majority of goods shipped in the first batch are fiber distribution cabinets and patch panel, totally 1893 units, which were transported in 6 containers. Figure 1 shows the cabinet and loaded containers.

Contact Us at Any Time

86-21-67877780
1st Floor, A5 Building, NO.3655 SixianRd, Songjiang District, Shanghai201614China
Send your inquiry directly to us